Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:-
Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
Naipaul
Clermont, FL
|
i would be interested only a partner. dseegolam@gmail.com
|
|
Anil Rathi
New Delhi, India
|
It is interesting but what is availabilty and reliability of power production in these type of plants
|
|
Nagendran A
Bangalore, India
|
We are intrested in a 1 MW Bio mass project for our own use , Please send in your quote and other details With Regards Nagendran A 9845023961 Ramesh wrote: Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:- Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant. Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit. (*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
John Gilvary
Fremont, CA
|
How much (in USD) are you looking for? Ramesh wrote: Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:- Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant. Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit. (*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
Kulothungan
Madras, India
|
Where is it proposed? Interested in joint venture , can be considered as a SPV. What is the present price of purchase of power from the plant by Kerala State Electricity Board.
|
|
Venkataramana
Hyderabad, India
|
i would be interested work with you i am a EPC contractor.
|
|
monika
New Delhi, India
|
We are interested in JV/Stake/Funding, pls advise the latest status Regards Monika Ramesh wrote: Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:- Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant. Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit. (*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
|
|
Vijay Kumbham
Hyderabad, India
|
We are interested in setting up a similar project for our own use. Please contact with details.
|
|
Vijay Narayan
Bangalore, India
|
We are a Consultants based at bangalore, our Clients are interested in taking over the Power plant, mentioned below, please let us know whether you are interested in selling the same. Kindly revert back to us at the earliest, so that we can take this further. Thanks Vijay Narayan Director On Demand Solutions I Pvt. Ltd. Bangalore M:09448003984 Ramesh wrote: Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:- Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant. Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit. (*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
“Seeking Project $1M up”
Joined: Nov 9, 2008
Comments: 1
Universe
ISP:
La Puente, CA
|
Innovative project financing for today's global leaders 100% LTV Worldwide Project Financing Funding from $2 Million USD to $100 Million USD Funding in 45 to 60 banking days Financing approvals within 24-48 hours Interest Rates between 6.5%- 8.25% 30 year fix. Interest Only Payments No Pre Payment Penalty No minimum credit requirements Borrower must provide a solid business plan and exit strategy 10-15% Equity Contribution into the deal is required Transaction facilitated by experienced structured financing attorney luisgtorres@paris.com Ramesh wrote: Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:- Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant. Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit. (*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
vibha
Madras, India
|
how to arrive at the water requirements for a 33TPH boiler at 66 Kg/hr and 495 dec to produce 65 Kg/hr at 485 deg c to the inlet turbine. that is what amount of water is required to produce 6MW per hour at this pressure ratings? and Mr.ramesh how did you arrive at the water requirement per day
|
|
eswar
India
|
We are intrested in a 1 MW Bio mass project for business purpose please let me know the details about project cost and what are the permissions requried to put up new plant
|
|
suresh kumar
Australia
|
details for 6mv power plant cost and other details
|
|
gaganjit sodhi
Samar, India
|
we r interested. if finance can be provided, when earliest can u start generating & selling power. respond to gaganjit on 9769692930
|
Joined: Fri Nov 6
Comments: 4
Greensboro, NC
|
John Gilvary wrote: How much (in USD) are you looking for? <quoted text> Hi John, I am planning to venture into a biomass plant myself in India and in the process of finding partners. Let me know if you would like to talk further. You can email me at kjohri@gmail.com Regards, Kaustubh
|
Joined: Fri Nov 6
Comments: 4
Greensboro, NC
|
Hi, I am looking for partnerships as well for a biomass plant in TN area. I am a resident of Chennai too, although I am at US currently. Please email me at kjohri@gmail.com for details. Regards, Kaustubh Kulothungan wrote: Where is it proposed? Interested in joint venture , can be considered as a SPV. What is the present price of purchase of power from the plant by Kerala State Electricity Board.
|
Joined: Fri Nov 6
Comments: 4
Greensboro, NC
|
Hi Monika, I am looking for JV/Funding for a biomass based plant in TN area. Please email me at kjohri@gmail.com for details. Regards, Kaustubh monika wrote: We are interested in JV/Stake/Funding, pls advise the latest status Regards Monika <quoted text>
|
Joined: Fri Nov 6
Comments: 4
Greensboro, NC
|
Hi Gaganjit, I am looking for financing as well for a biomass based plant in TN. Kindly email me at kjohri@gmail.com and we can discuss the details. Regards, Kaustubh gaganjit sodhi wrote: we r interested. if finance can be provided, when earliest can u start generating & selling power. respond to gaganjit on 9769692930
|
|
Thomas
|
US IMMIGRATION THROUGH INVESTMENT We offer Qualified Investment for foreign investors seeking permanent residence in the United States. Individuals will be eligible under EB-5 immigrant visa status to obtain US green card based on a minimum financial investment of US $500,000. Prepared Term Sheets available for current investment opportunities which include FEATURE FILM PRODUCTION and a RENEWABLE ENERGY PROJECT. All inquiries held strictly confidential. Ramesh wrote: Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field. In Brief:- Capacity: 6 MW / 8 MW Plant Load Factor: 80 % Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum Auxiliary Consumption: 10 % Net Export: 379 / 505 Lakhs KWHr (Units) per annum Land Requirement: 15 Acres Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc. Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler (Depending on the Fuel Configuration) Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc. Project Cost (*): 22.00 / 28.00 Crores (INR) Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 1050 per M.T OF Biomass. Fixed Cost per Unit: (Financing Charges & O & M Cost)~ Rs. 1.00 per Unit Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit. - 4 years with a sale price of Rs. 3.25 per Unit. - 7 years with a sale price of Rs. 3.00 per Unit. CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant. Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit. (*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
|
|
|